New · Decks

We've been building the line.

Now we build the floor.

Decks, covered decks, and the structure underneath them. Built by the crew that already put in half the cedar on your street, on the same footings, to the same string line.

  • Covered Decks01
  • Composite Decking02
  • Cedar Decking03
  • Elevated & Hillside04
  • Multi-Level & Wrap05

Send us the address. We read the grade, the drainage, and whether it needs a permit, then put a number in your hands.

Finished western red cedar deck with a covered timber pavilion in a Seattle backyard.
Cedar deck + pavilion · Seattle
01

It starts in the ground.

Poured piers below the frost line, on undisturbed soil, sized to the load coming down on them. On a Seattle hillside this is most of the engineering and all of the cost you will never see.

02

Square before it is pretty.

Pressure-treated posts and beams, joist hangers instead of toe-nails, blocking where the span asks for it. Nothing goes on top until the frame is true.

03

The part nobody quotes.

Butyl tape capping every joist so screw holes never hold water. A few hundred dollars of material that buys the frame another decade. Most quotes skip it. Ours does not.

04

Now it gets a floor.

Hidden fasteners, consistent reveals, boards run to a string line. Stainless or coated hardware throughout, because one rust streak is forever.

05

And then you just live out there.

Rail posts bolted through the frame, stairs cut to land right, and a roof if you want the thing to earn its keep in February.

It starts in the ground.
Square before it is pretty.
The part nobody quotes.
Now it gets a floor.
And then you just live out there.
01 · Footings1 / 5
03 · The ChoiceSun decides, not budget

Cedar or composite?
Your yard already decided.

Cedar deck under a post-and-beam cover with clear roofing that sheds rain and keeps the daylight.
04 · The Cover
10weeks a year
you actually
use it

A roof is the difference between a summer deck and a room.

A hundred and fifty days of rain a year decide how often you go outside. Cover the same square footage and it becomes coffee in November, dinner in March, a barbecue that does not get rained off.

Composite deck cut around a mature tree, enclosed by a matching horizontal cedar fence.One job: deck + matching fence
05 · Together

One crew. One trip.
One line of cedar.

The fence and the deck come off the same lumber order, get cut by the same crew, and land on the same schedule. Do them a year apart and you pay to mobilize twice, then spend the summer hoping two batches of stain still match.

We were the fence company first. That is the advantage.

06 · Questions

The six we
always get.

Probably, and sooner than you think. Seattle requires a construction permit once the walking surface is more than 18 inches above grade, or if it is a roof deck. Most of Washington uses a 30-inch trigger, so advice you read online is often wrong for a Seattle address. We confirm it for your lot before we quote, and we handle the submittal if it needs one.